Home /
Our references
Strong references for public institutions or private companies
Infrastructures
-
Brussels Mobility (Tunnels)
Brussels-Capital RegionMission: Technical assistance and tunnel management (investment plan, renovation, 24/7 technical support)
Number of tunnels: 26
Duration: 2022 - 2026
Operator: SPRB Brussels Mobility
Team: On-site team of 3 engineers and 15 technicians
Buildings
-
D’Ieteren Immo
Technical audit of 32 car dealershipsRecipient: Public
Contract: Audit of technical installations based on the NEN2767 standard and preparation of tender specifications for operation and maintenance of 32 dealerships in Belgium (Audi, Bentley, Lamborghini, Porsche, etc.)
Duration: 2022-2023
-
European CouncilMission: Quality control of the maintenance of technical installations in 4 buildings (Justus Lipsius, Lex 2000, Europa Building, and the European nursery). The mission is conducted according to the European NEN2767 standard.
Duration: 2024 - 2026
-
RTBF (Belgium’s Public Broadcasting Organization)
BrusselsMission: Preparation of the maintenance operation tender specifications for the new headquarters (MEDIA SQUARE - 60,000 m²)
Duration: 2024 - 2025
-
Brussels AirlinesMission: Technical audit as part of a due diligence for an aircraft maintenance hangar. This includes architectural and technical elements, regulatory compliance, and investment planning for the next 10 years.
Duration: 2024
-
GENERALI BelgiumMission: Preparation of tender specifications for the operation and maintenance of technical installations in 8 buildings located in Belgium and Luxembourg. Audit of technical installations following the NEN2767 standard.
Duration: 2024 - 2025
-
Federal Pensions Service
BruxellesMission: Preparation of tender specifications for the operation and maintenance of the Midi Tower (60,000 m²). Investment budget planning for the renewal of technical installations over 10 years. Quality control of services provided.
Duration: 2024 - 2025
-
Sibelga
BruxellesBrussels: Assistance for the reorganization of facility services (Hard and Soft). Preparation of tender specifications for technical management and two execution missions (Hard and Soft).
Duration: 2021 - 2023
-
Sibelga
BrusselsMission: Audit of technical installations based on the NEN2767 standard.
Duration: 2021 - 2023
-
ActirisMission: Technical inventory of installations based on the NEN2767 standard.
Building: Astro Tower
Duration: June 2019 - June 2020
-
University of LiègeMission: Consulting and technical assistance for the development of a maintenance tender, bid analysis, monitoring, and maintenance control of technical installations.
Building: Agro-Bio-Tech Laboratory, Gembloux
Duration: March 2019 - December 2020
-
Home InvestMission : Boiler room audit and maintenance contract follow-up for 4 buildings.
Duration: September 2019 - 2020
-
French Embassy
Electrical diagnostics and carpentry expertise.Mission: Electrical diagnostics and carpentry expertise.
Duration: 1st quarter 2019
Building: French Embassy in Brussels and Ambassador's Residence in The Hague
-
Edificio
Energy audit Concert NobleMission: Energy audit
Duration: February 2019
Building: Concert Noble
-
European Commission
Méthodologies de contrôleMission: Development of control methodologies and occasional execution of controls related to building operation contracts for the European Commission in Brussels and its surroundings.
Duration: December 2017 - June 2019
-
CHU Liège
Sart TilmanMission: Technical inventory of installations based on the NEN2767 standard.
Duration: April 2019
-
AG Real Estate
BerchemMission: Technical audit and maintenance control
Duration: January 2019
-
EGIS Conseil BâtimentsMission: Audit of technical installations (HVAC, electricity, plumbing, electromechanics) according to the NEN2767 standard
Duration: 2017
Buildings: Euroclear sites in Belgium, France, Netherlands, UK and Poland
-
Wereldhave
Sites Nivelles et WaterlooContract: Technical management support for shopping centers in Nivelles and Waterloo
Mission: Maintenance quality control, monitoring of works
Duration: 2017 - 2018
Team: On-site provision of a maintenance engineer (specialized in HVAC and electricity)
-
Buildings Agency – Finance Tower
BrusselsContract: Technical management assistance for the Finance Tower in Brussels (120,000 m²)
Duration: 2010 - 2015
Team: On-site provision of 4 people: 1 architect-engineer, 2 project engineers, 1 assistant
Mission: Service contract management (technical maintenance, cleaning, security, etc.), maintenance provider control, intervention request management, management of works and specific arrangements (structural and finishing works), plan management
-
European Parliament
Site StrasbourgMission: Technical management assistance (maintenance, cleaning, works)
Duration: 2014 - 2015
Team: On-site provision of 11 people: 5 engineers, 5 architects, 1 assistant draftsman
-
European Parliament
Site BrusselsContract: Building operation support (15 buildings - 650,000 m²)
Mission: Quality control of structural works, finishing works, cleaning, and environment
Duration: 2016 - 2021
Team: On-site provision of a team comprising 10 engineers, 9 architects, and 1 draftsman technician
-
European Commission
Site BrusselsMission : Technical helpdesk
Duration : 2006 - 2019
Technicians: 7
-
Belfius Bank – Rogier Tower
(Place Rogier - rue du Progrès - rue de Brabant)Mission : Assistance for the organization of a call for tenders and renegotiation of the operation and maintenance contract for technical installations
Duration: 2010 - 2020
-
European Parliament
Site BrusselsContract: Assistance in organizing tenders for building operation and maintenance (15 buildings - 650,000 m²)
Duration: 2016 - 2021
-
Buildings Agency
Finance Tower - BrusselsMission: Assistance in organizing a technical management tender for the Finance Tower in Brussels (120,000 m²)
Duration : 2010 - 2015
-
European School
StrasbourgMission: Client assistance in organizing a facility management tender (maintenance, cleaning, reception, catering, landscaping)
Duration: 2015 - 2016
-
European Parliament
Site StrasbourgMission: Assistance in organizing a technical management tender for the site (maintenance, cleaning, works)
Duration: 2014 - 2015
-
UCB
BrusselsBuilding type: Offices
Missions: Programming study, floor plan studies, project management of works
Area: 20,000 m²
Duration : 1998 - 2000
-
RTL – TVI
EvereBuilding type: Offices
Missions: Programming study, floor plan studies, project management of works
Area : 15,000 m² - 450 workstations
Duration: 2005 - 2008
-
ALD Automotive
EvereBuilding type: Offices
Missions: Programming study, floor plan studies, project management of works
Duration: 2016
-
Committee of the Regions
BrusselsBuilding type: Administrative
Missions: Programming study, floor plan studies, project management of works
Area: 45,000 m²
Duration: 2000 - 2004
-
Douwe Egberts
GrimbergenBuilding type: Offices
Missions : Programming study, floor plan studies, project management of works
Area: 15,000 m²
Duration: 2001 - 2003
-
French Embassy
BruxellesBuilding type: Administration
Missions: Programming study, floor plan studies, project management of works
Duration: 2019
-
Martyrs’ Square Hotel
BrusselsBuilding type: Hotel
Mission: Technical Systems
Description: Rehabilitation of an old building into a 4-star hotel
Area: 3,700 m²
Duration: 2017 - 2020
Owner: Foncière Neo Classique
Architect: ARTER
-
Marivaux residence
BrusselsBuilding type: Collective Housing
Mission: Technical Systems
Description: Conversion of a cinema into a residence with 121 student rooms, 15 apartments, and underground parking
Area: 7,200 m2
Duration: 2020 - 2023
Owner: CITRED
Architect: UNAA
-
Noble Age
WaterlooBuilding type: Healthcare
Mission: Technical Systems - PEB
Description: Construction of a 150-bed nursing home
Area: 9,000 m²
Duration: 2011 - 2013
Owner: Noble Age
Architect: AIA / AAU
-
Eureka
EvereBuilding type: Healthcare - Housing
Mission: Technical Systems
Description: Construction of a 168-bed nursing home (8,000 m²) and a serviced residence with 27 apartments
Area: 12,300 m² above ground + 1,500 m² basement
Duration: Jan. 2013 - sept. 2014
Owner: Burco
Architect: Archi 2000
-
New City
ForestBuilding type: Housing
Mission: Technical Systems
Description: Heavy renovation of a building complex with 71 social housing units
Area: 9,900 m2
Budget: €7,800,000
Duration: 2017 - 2020
Owner: Foyer du Sud
Architect: BEAU Brussels
-
Nautilus
AnderlechtBuilding type: Housing + Nursery + Shops
Mission: Technical Systems - PEB
Description: Construction of 4 buildings with 197 apartments, a nursery, shops, 240 parking spaces, and 280 bicycle spaces
Area: 26,000 m2
Duration: 2016 - 2020
Owner: Eaglestone
Architect: Axent Architects
-
Ambassador Park
EvereBuilding type: Housing
Mission: Technical Systems - PEB
Description: Construction of 7 buildings with 177 apartments and 2 levels of underground parking
Area: 16,700 m² (housing) + 6,900 m² (parking)
Duration: 2015 - 2019
Owner: Skyline Europe
Architect: Archi 2000
-
SFAR – Molenblok
Neder-Over-HeembeekBuilding type: Housing
Mission: PEB - PHPP
Description: Construction of 28 social housing units and underground parking lots
Area: 3,200 m² above ground
Budget: €4,100,000
Duration: 2011 - 2016
Owner: SFAR (S.R.I.B.)
Architect: Architect
-
SFAR – Chemin Vert
Neder-Over-HeembeekBuilding type: Housing - Facilities
Mission: PEB
Description: Construction of 146 passive social and mid-range housing units, one professional office, and 121 parking spaces
Area: 22,800 m² above ground + 5,000 m² basement
Duration: 2018 - 2021
Owner: SFAR (S.R.I.B.)
Architect: B2Ai
-
Crèche – Chaussée de Gand
Molenbeek Saint-JeanBuilding type: Housing - public facilities
Mission: Technical Systems - PEB - PHPP
Description: Construction of 8 passive housing units and a low-energy nursery for 48 children
Area: 730 m²
Budget: €1,044,000
Duration: 2011 - 2014
Owner: Municipality of Molenbeek-Saint-Jean
Architect: Pierre BLONDEL Architects
-
SFAR – Midi A1
Saint-GillesMission: PEB - PHPP
Description: Construction of 30 mid-range passive housing units and underground parking
Area: 3,200 m² above ground + 780 m² basement
Budget: €5,100,000
Duration: 2013 - 2018
Owner: SFAR (S.R.I.B.)
Architect: ARCHIWIND
-
Motel OneBuilding type: Hotel + shops
Brussels: Technical Systems - PEB
Description: Renovation of the former "Le Soir" newspaper building into a hotel with 490 rooms and a 200-space parking lot
Area: 14,500 m² above ground + 5,600 m² basement
Budget: €9,600,000
Duration: 2010 - 2014
Owner: Besix Red
Architect: Archi 2000
-
Byrrh business park
LaekenBuilding type : Offices
Mission: Technical Systems - PEB
Description: Renovation and restoration of an old building for reuse as the Byrrh business center + nursery
Area : 11,000 m2
Duration : 2015 - 2017
Owner: CPAS Brussels
Architect: Ozon-Creplet
-
Museum of Ceramics
La LouvièreBuilding type: Museum
Mission : Technical Systems
Description: Complete studies for the construction of a low-energy museum
Area: 3,800 m2
Budget: €7,000,000
Duration: 2010 - 2015
Owner: City of La Louvière
Architect: Atelier De Visscher - Vincentelli
-
European Woluwe
Woluwe Saint-LambertBuilding type: Housing
Mission: Technical Systems
Description: Construction of 3 buildings with 62 apartments, 69 underground parking spaces, and 13 above-ground parking spaces
Area: 5,700 m2
Duration : 2020 - 2023
Owner: Bouygues Immobilier
Architect: A2RC
-
Hôtel Communal de Laeken
LaekenBuilding type: Administration
Mission: Technical Systems
Description: Studies of technical equipment (electrical circuits, HVAC, sanitation) for the complete renovation of the town hall
Area: 9,300 m2
Duration: 2007 - 2012
Owner: City of Brussels
Architect: A2RC
-
FEB
BruxellesBuilding type : Hotel - Housing
Missions: Programming study, floor plan studies, project management of works
Area: 1,935 m²
Duration: 2009 - 2010
-
STIB
BruxellesBuilding type: Offices
Missions: Programming study, floor plan studies, project management of works
Area: 20,000 m² - 700 workstations
Duration: 2007 - 2008
-
European Commission
Site BrusselsMission: Technical helpdesk
Duration: 2006 - 2019
Technicians: 7
-
European Parliament
Sites Brussels - Luxembourg - StrasbourgMission: Technical helpdesk
Duration: 2009 - 2018
Technicians: 10
-
NATO
BrusselsContract: Assistance in the preparation of the maintenance specifications for the new Brussels headquarters (200,000 m²) - Analysis of maintenance quality evaluation methods (AMDEC, NEN 2767) - Assistance with the technical reception of installations for commissioning
Duration: 2016 - 2018
-
AEW
Technical installations auditMission: Audit of technical installations (HVAC, Electrical, Sanitary, Electromechanical)
Duration: 2016 - 2017
Buildings: Louise Center - Louvain and Brussels Shops - 4 buildings in Antwerp, Brussels, Ghent, Bruges - 1,800 m²
-
Belfius Bank – Rogier Tower
(Place Rogier - rue du Progrès - rue de Brabant)Mission: Technical audit and assistance for the renegotiation of the contract for the operation and maintenance of technical installations - Study and analysis of CAPEX investment budgets over 10 years
Duration: March-September 2020