Go to content
Home / References

Our references

Strong references for public institutions or private companies

Infrastructures

  • Brussels Mobility (Tunnels)
    Brussels-Capital Region
    Mission: Technical assistance and tunnel management (investment plan, renovation, 24/7 technical support)
    Number of tunnels: 26
    Duration: 2022 - 2026
    Operator: SPRB Brussels Mobility
    Team: On-site team of 3 engineers and 15 technicians

Buildings

Filter by:
  • D’Ieteren Immo
    Technical audit of 32 car dealerships
    Recipient: Public
    Contract: Audit of technical installations based on the NEN2767 standard and preparation of tender specifications for operation and maintenance of 32 dealerships in Belgium (Audi, Bentley, Lamborghini, Porsche, etc.)
    Duration: 2022-2023
  • European Council
    Mission: Quality control of the maintenance of technical installations in 4 buildings (Justus Lipsius, Lex 2000, Europa Building, and the European nursery). The mission is conducted according to the European NEN2767 standard.
    Duration: 2024 - 2026
  • RTBF (Belgium’s Public Broadcasting Organization)
    Brussels
    Mission: Preparation of the maintenance operation tender specifications for the new headquarters (MEDIA SQUARE - 60,000 m²)
    Duration: 2024 - 2025
  • Brussels Airlines
    Mission: Technical audit as part of a due diligence for an aircraft maintenance hangar. This includes architectural and technical elements, regulatory compliance, and investment planning for the next 10 years.
    Duration: 2024
  • GENERALI Belgium
    Mission: Preparation of tender specifications for the operation and maintenance of technical installations in 8 buildings located in Belgium and Luxembourg. Audit of technical installations following the NEN2767 standard.
    Duration: 2024 - 2025
  • Federal Pensions Service
    Bruxelles
    Mission: Preparation of tender specifications for the operation and maintenance of the Midi Tower (60,000 m²). Investment budget planning for the renewal of technical installations over 10 years. Quality control of services provided.
    Duration: 2024 - 2025
  • Sibelga
    Bruxelles
    Brussels: Assistance for the reorganization of facility services (Hard and Soft). Preparation of tender specifications for technical management and two execution missions (Hard and Soft).
    Duration: 2021 - 2023
  • Sibelga
    Brussels
    Mission: Audit of technical installations based on the NEN2767 standard.
    Duration: 2021 - 2023
  • Actiris
    Mission: Technical inventory of installations based on the NEN2767 standard.
    Building: Astro Tower
    Duration: June 2019 - June 2020
  • University of Liège
    Mission: Consulting and technical assistance for the development of a maintenance tender, bid analysis, monitoring, and maintenance control of technical installations.
    Building: Agro-Bio-Tech Laboratory, Gembloux
    Duration: March 2019 - December 2020
  • Home Invest
    Mission : Boiler room audit and maintenance contract follow-up for 4 buildings.
    Duration: September 2019 - 2020
  • French Embassy
    Electrical diagnostics and carpentry expertise.
    Mission: Electrical diagnostics and carpentry expertise.
    Duration: 1st quarter 2019
    Building: French Embassy in Brussels and Ambassador's Residence in The Hague
  • Edificio
    Energy audit Concert Noble
    Mission: Energy audit
    Duration: February 2019
    Building: Concert Noble
  • European Commission
    Méthodologies de contrôle
    Mission: Development of control methodologies and occasional execution of controls related to building operation contracts for the European Commission in Brussels and its surroundings.
    Duration: December 2017 - June 2019
  • CHU Liège
    Sart Tilman
    Mission: Technical inventory of installations based on the NEN2767 standard.
    Duration: April 2019
  • AG Real Estate
    Berchem
    Mission: Technical audit and maintenance control
    Duration: January 2019
  • EGIS Conseil Bâtiments
    Mission: Audit of technical installations (HVAC, electricity, plumbing, electromechanics) according to the NEN2767 standard
    Duration: 2017
    Buildings: Euroclear sites in Belgium, France, Netherlands, UK and Poland
  • Wereldhave
    Sites Nivelles et Waterloo
    Contract: Technical management support for shopping centers in Nivelles and Waterloo
    Mission: Maintenance quality control, monitoring of works
    Duration: 2017 - 2018
    Team: On-site provision of a maintenance engineer (specialized in HVAC and electricity)
  • Buildings Agency – Finance Tower
    Brussels
    Contract: Technical management assistance for the Finance Tower in Brussels (120,000 m²)
    Duration: 2010 - 2015
    Team: On-site provision of 4 people: 1 architect-engineer, 2 project engineers, 1 assistant
    Mission: Service contract management (technical maintenance, cleaning, security, etc.), maintenance provider control, intervention request management, management of works and specific arrangements (structural and finishing works), plan management
  • European Parliament
    Site Strasbourg
    Mission: Technical management assistance (maintenance, cleaning, works)
    Duration: 2014 - 2015
    Team: On-site provision of 11 people: 5 engineers, 5 architects, 1 assistant draftsman
  • European Parliament
    Site Brussels
    Contract: Building operation support (15 buildings - 650,000 m²)
    Mission: Quality control of structural works, finishing works, cleaning, and environment
    Duration: 2016 - 2021
    Team: On-site provision of a team comprising 10 engineers, 9 architects, and 1 draftsman technician
  • European Commission
    Site Brussels
    Mission : Technical helpdesk
    Duration : 2006 - 2019
    Technicians: 7
  • Tour Rogier Belfius
    Belfius Bank – Rogier Tower
    (Place Rogier - rue du Progrès - rue de Brabant)
    Mission : Assistance for the organization of a call for tenders and renegotiation of the operation and maintenance contract for technical installations
    Duration: 2010 - 2020
  • European Parliament
    Site Brussels
    Contract: Assistance in organizing tenders for building operation and maintenance (15 buildings - 650,000 m²)
    Duration: 2016 - 2021
  • Buildings Agency
    Finance Tower - Brussels
    Mission: Assistance in organizing a technical management tender for the Finance Tower in Brussels (120,000 m²)
    Duration : 2010 - 2015
  • European School
    Strasbourg
    Mission: Client assistance in organizing a facility management tender (maintenance, cleaning, reception, catering, landscaping)
    Duration: 2015 - 2016
  • European Parliament
    Site Strasbourg
    Mission: Assistance in organizing a technical management tender for the site (maintenance, cleaning, works)
    Duration: 2014 - 2015
  • UCB
    Brussels
    Building type: Offices
    Missions: Programming study, floor plan studies, project management of works
    Area: 20,000 m²
    Duration : 1998 - 2000
  • RTL – TVI
    Evere
    Building type: Offices
    Missions: Programming study, floor plan studies, project management of works
    Area : 15,000 m² - 450 workstations
    Duration: 2005 - 2008
  • ALD Automotive
    Evere
    Building type: Offices
    Missions: Programming study, floor plan studies, project management of works
    Duration: 2016
  • Committee of the Regions
    Brussels
    Building type: Administrative
    Missions: Programming study, floor plan studies, project management of works
    Area: 45,000 m²
    Duration: 2000 - 2004
  • Douwe Egberts
    Grimbergen
    Building type: Offices
    Missions : Programming study, floor plan studies, project management of works
    Area: 15,000 m²
    Duration: 2001 - 2003
  • French Embassy
    Bruxelles
    Building type: Administration
    Missions: Programming study, floor plan studies, project management of works
    Duration: 2019
  • Martyrs’ Square Hotel
    Brussels
    Building type: Hotel
    Mission: Technical Systems
    Description: Rehabilitation of an old building into a 4-star hotel
    Area: 3,700 m²
    Duration: 2017 - 2020
    Owner: Foncière Neo Classique
    Architect: ARTER
  • Marivaux residence
    Brussels
    Building type: Collective Housing
    Mission: Technical Systems
    Description: Conversion of a cinema into a residence with 121 student rooms, 15 apartments, and underground parking
    Area: 7,200 m2
    Duration: 2020 - 2023
    Owner: CITRED
    Architect: UNAA
  • Noble Age
    Waterloo
    Building type: Healthcare
    Mission: Technical Systems - PEB
    Description: Construction of a 150-bed nursing home
    Area: 9,000 m²
    Duration: 2011 - 2013
    Owner: Noble Age
    Architect: AIA / AAU
  • Eureka
    Evere
    Building type: Healthcare - Housing
    Mission: Technical Systems
    Description: Construction of a 168-bed nursing home (8,000 m²) and a serviced residence with 27 apartments
    Area: 12,300 m² above ground + 1,500 m² basement
    Duration: Jan. 2013 - sept. 2014
    Owner: Burco
    Architect: Archi 2000
  • New City
    Forest
    Building type: Housing
    Mission: Technical Systems
    Description: Heavy renovation of a building complex with 71 social housing units
    Area: 9,900 m2
    Budget: €7,800,000
    Duration: 2017 - 2020
    Owner: Foyer du Sud
    Architect: BEAU Brussels
  • Nautilus
    Anderlecht
    Building type: Housing + Nursery + Shops
    Mission: Technical Systems - PEB
    Description: Construction of 4 buildings with 197 apartments, a nursery, shops, 240 parking spaces, and 280 bicycle spaces
    Area: 26,000 m2
    Duration: 2016 - 2020
    Owner: Eaglestone
    Architect: Axent Architects
  • Ambassador Park
    Evere
    Building type: Housing
    Mission: Technical Systems - PEB
    Description: Construction of 7 buildings with 177 apartments and 2 levels of underground parking
    Area: 16,700 m² (housing) + 6,900 m² (parking)
    Duration: 2015 - 2019
    Owner: Skyline Europe
    Architect: Archi 2000
  • SFAR – Molenblok
    Neder-Over-Heembeek
    Building type: Housing
    Mission: PEB - PHPP
    Description: Construction of 28 social housing units and underground parking lots
    Area: 3,200 m² above ground
    Budget: €4,100,000
    Duration: 2011 - 2016
    Owner: SFAR (S.R.I.B.)
    Architect: Architect
  • SFAR – Chemin Vert
    Neder-Over-Heembeek
    Building type: Housing - Facilities
    Mission: PEB
    Description: Construction of 146 passive social and mid-range housing units, one professional office, and 121 parking spaces
    Area: 22,800 m² above ground + 5,000 m² basement
    Duration: 2018 - 2021
    Owner: SFAR (S.R.I.B.)
    Architect: B2Ai
  • Crèche – Chaussée de Gand
    Molenbeek Saint-Jean
    Building type: Housing - public facilities
    Mission: Technical Systems - PEB - PHPP
    Description: Construction of 8 passive housing units and a low-energy nursery for 48 children
    Area: 730 m²
    Budget: €1,044,000
    Duration: 2011 - 2014
    Owner: Municipality of Molenbeek-Saint-Jean
    Architect: Pierre BLONDEL Architects
  • SFAR – Midi A1
    Saint-Gilles
    Mission: PEB - PHPP
    Description: Construction of 30 mid-range passive housing units and underground parking
    Area: 3,200 m² above ground + 780 m² basement
    Budget: €5,100,000
    Duration: 2013 - 2018
    Owner: SFAR (S.R.I.B.)
    Architect: ARCHIWIND
  • Motel One
    Building type: Hotel + shops
    Brussels: Technical Systems - PEB
    Description: Renovation of the former "Le Soir" newspaper building into a hotel with 490 rooms and a 200-space parking lot
    Area: 14,500 m² above ground + 5,600 m² basement
    Budget: €9,600,000
    Duration: 2010 - 2014
    Owner: Besix Red
    Architect: Archi 2000
  • Byrrh business park
    Laeken
    Building type : Offices
    Mission: Technical Systems - PEB
    Description: Renovation and restoration of an old building for reuse as the Byrrh business center + nursery
    Area : 11,000 m2
    Duration : 2015 - 2017
    Owner: CPAS Brussels
    Architect: Ozon-Creplet
  • Museum of Ceramics
    La Louvière
    Building type: Museum
    Mission : Technical Systems
    Description: Complete studies for the construction of a low-energy museum
    Area: 3,800 m2
    Budget: €7,000,000
    Duration: 2010 - 2015
    Owner: City of La Louvière
    Architect: Atelier De Visscher - Vincentelli
  • European Woluwe
    Woluwe Saint-Lambert
    Building type: Housing
    Mission: Technical Systems
    Description: Construction of 3 buildings with 62 apartments, 69 underground parking spaces, and 13 above-ground parking spaces
    Area: 5,700 m2
    Duration : 2020 - 2023
    Owner: Bouygues Immobilier
    Architect: A2RC
  • Hôtel Communal de Laeken
    Laeken
    Building type: Administration
    Mission: Technical Systems
    Description: Studies of technical equipment (electrical circuits, HVAC, sanitation) for the complete renovation of the town hall
    Area: 9,300 m2
    Duration: 2007 - 2012
    Owner: City of Brussels
    Architect: A2RC
  • FEB
    Bruxelles
    Building type : Hotel - Housing
    Missions: Programming study, floor plan studies, project management of works
    Area: 1,935 m²
    Duration: 2009 - 2010
  • STIB
    Bruxelles
    Building type: Offices
    Missions: Programming study, floor plan studies, project management of works
    Area: 20,000 m² - 700 workstations
    Duration: 2007 - 2008
  • European Commission
    Site Brussels
    Mission: Technical helpdesk
    Duration: 2006 - 2019
    Technicians: 7
  • European Parliament
    Sites Brussels - Luxembourg - Strasbourg
    Mission: Technical helpdesk
    Duration: 2009 - 2018
    Technicians: 10
  • NATO
    Brussels
    Contract: Assistance in the preparation of the maintenance specifications for the new Brussels headquarters (200,000 m²) - Analysis of maintenance quality evaluation methods (AMDEC, NEN 2767) - Assistance with the technical reception of installations for commissioning
    Duration: 2016 - 2018
  • AEW
    Technical installations audit
    Mission: Audit of technical installations (HVAC, Electrical, Sanitary, Electromechanical)
    Duration: 2016 - 2017
    Buildings: Louise Center - Louvain and Brussels Shops - 4 buildings in Antwerp, Brussels, Ghent, Bruges - 1,800 m²
  • Tour Rogier Belfius
    Belfius Bank – Rogier Tower
    (Place Rogier - rue du Progrès - rue de Brabant)
    Mission: Technical audit and assistance for the renegotiation of the contract for the operation and maintenance of technical installations - Study and analysis of CAPEX investment budgets over 10 years
    Duration: March-September 2020

Optimize the total cost of your buildings